Design Schedule and Duration
STEP 1:
First Site Visit + Cost Estimation to complete the project.
(To confirm a site visit outside Dhaka, a non-refundable fee of BDT 10,000 is payable in advance.)
Duration- 3-7 days
STEP 2:
Initial 2D Drawings + Floor Plans + Initial BOQ + Meeting with Client
Duration- 1-2 days
STEP 3:
3D Model + Three (3) Rendered Images + Meeting with Client
Duration- 2-3 days
STEP 4:
(studio time to progress design) + Two (2) Revisions + Meetings with Client
Duration- 6-9 days
STEP 5:
Final 2D Drawing + Three (3) Final Rendered Images + Final BOQ
Duration- 3-5 days
Total Duration- 15-26 days - READY FOR CONSTRUCTION